欧美乱妇无码毛片斯巴达三百勇士,西西444www无码大胆,97精品超碰一区二区三区 ,在线免播放器高清观看

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.za6322222.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點安裝事項

來源:http://www.za6322222.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.za6322222.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.za6322222.com consulting service

免费网站看sm调教打屁股视频| 出轨的女人在线观看| www国产精品内射老熟女| 日日摸日日碰夜夜爽无码亚洲v | 日本亲与子乱人妻ihd| 亚洲精品tv久久久久久久久久| 免费又黄又爽又色的视频| 国产av电影在线观看| 动漫精品一区二区三区在线观看 | 成年美女黄网站色大片免费看| 国产在线国偷精品免费看| 日日噜噜夜夜狠狠久久人人| 99久久精品国产一区二区三区| 免费观看性欧美大片无片 | 乡下熟妇xxxx妇色黄| 国产强被迫伦姧在线观看无码| 局长含了一整晚我的奶头 | 午夜时刻免费入口| 潘金莲被武松高潮八次小说| 精品国产污污免费网站入口 | 熟妇少妇任你躁在线无码| 我把护士日出水了视频90分钟| 免费在线观看成人电影| 婷婷综合久久中文字幕蜜桃三电影| 日韩av无码| 第三书包h文辣文吃奶| 我们的日子电视剧免费观看完整版| 久久国产精品无码网站| 一区二区三区| 国产精品久久久久精品综合紧| 国产高潮流白浆啊免费a片动态| 亚洲精品99久久久久中文字幕| 日韩人妻无码一区二区三区| 国产偷窥盗拍丰满老熟女| 欧美三级在线播放| 我和亲妺妺乱的性视频| 肉妇春潮干柴烈火myfducc| 高潮捣出白浆嗯啊哭叫h漫画 | 女性私密整形视频| 免费人做人爱视频| 高清一区二区三区日本|