欧美乱妇无码毛片斯巴达三百勇士,西西444www无码大胆,97精品超碰一区二区三区 ,在线免播放器高清观看

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.za6322222.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

施工現(xiàn)場(chǎng)的木工加工棚怎么制作

來(lái)源:http://www.za6322222.com/   發(fā)布時(shí)間:2022-11-11

現(xiàn)在的木工加工棚是每個(gè)建筑施工的地方的必備品,在施工現(xiàn)場(chǎng)保護(hù)工人的,但是大家了解木工加工棚制作工藝么?廠家給大家具體介紹一下。
Now the woodworking shed is a necessary item in every building construction area, and it protects the safety of workers at the construction site. But do you know the woodworking shed production process? The manufacturer gave you a detailed introduction.
1、現(xiàn)場(chǎng)鋼筋制作、木工加工、空壓機(jī)、小型機(jī)械機(jī)具等應(yīng)設(shè)置木工加工棚。
1. Woodworking shed shall be set for on-site reinforcement fabrication, woodworking, air compressor, small machinery and tools, etc.
2、棚體高度與寬度應(yīng)滿足作業(yè)需求。棚立柱采用埋地或螺栓錨地等方式固定牢固。
2. The height and width of the shed shall meet the operation requirements. The shed column shall be firmly fixed by means of burial or bolt anchorage.
3、棚體應(yīng)用龍骨加強(qiáng)或四周纜風(fēng)拉結(jié)等方式,保證在臺(tái)風(fēng)等災(zāi)害性氣候下有足夠的強(qiáng)度、使用。
3. The shed shall be strengthened by keel or tied by cable wind around to ensure sufficient strength and safe use in typhoon and other disastrous climates.
4、棚體頂面懸掛警示標(biāo)語(yǔ),棚內(nèi)懸掛操作規(guī)程等標(biāo)牌。
4. Safety warning slogans shall be hung on the roof of the shed, and signs such as safety operation procedures shall be hung inside the shed.
5、棚內(nèi)應(yīng)設(shè)置專用牌板,用以掛放特種作業(yè)人員作業(yè)證復(fù)印件、技術(shù)交底等資料;應(yīng)設(shè)置專用箱柜,用以存放作業(yè)人員的勞動(dòng)防護(hù)、作業(yè)工器具等物品。
5. Special signboards shall be set in the shed to hang copies of work permits, technical disclosure and other materials of special operators; Special boxes and cabinets shall be set up to store the labor protection, operation tools and instruments of operators.
木工加工棚
6、棚體處于高空墜物半徑內(nèi)或處于起重機(jī)臂桿回轉(zhuǎn)范圍之內(nèi)時(shí),棚頂采用雙層5cm厚木板鋪?lái)敺雷o(hù),上下兩層間隔0.6m。
6. When the shed is within the radius of falling objects or within the slewing range of the crane boom, the roof of the shed shall be covered with double-layer 5cm thick wooden boards, with an interval of 0.6m between the upper and lower layers.
7、強(qiáng)噪設(shè)備木工加工棚應(yīng)采取封閉、加裝隔音板等措施進(jìn)行降噪,強(qiáng)光設(shè)備應(yīng)設(shè)置防光污染措施。
7. The woodworking shed for strong noise equipment shall be closed and equipped with sound insulation boards to reduce noise, and the strong light equipment shall be provided with light pollution prevention measures.
8、地鐵施工一般場(chǎng)地狹小,困難時(shí)可根據(jù)情況采用雙層棚、推拉式棚、或結(jié)合使用。搭建應(yīng)進(jìn)行專項(xiàng)設(shè)計(jì),保證棚體有足夠強(qiáng)度。
8. Generally, the subway construction site is narrow, and double decked shed, push-pull shed, or combination can be used according to the situation when it is difficult. Special design shall be carried out for erection to ensure adequate strength of the shed.
雖然木工加工棚在施工場(chǎng)所一定程度可以保護(hù),但是還是需要工資人員自身多多注意,希望我們的介紹能對(duì)大家有所幫助,有需要木工加工棚的企業(yè)可以聯(lián)系我們http://www.za6322222.com!
Although the woodworking shed can protect the safety of the construction site to a certain extent, the wage staff should pay more attention to it. I hope our introduction can help you. Enterprises that need woodworking sheds can contact us http://www.za6322222.com !

沈阳熟妇28厘米大战黑人| 国产精品成人国产乱| 与亲女洗澡伦了东北| FREE性欧美HD另类精品| 无码人妻精品一区二区蜜桃网站| jealousvue成熟分类| 浪货趴办公桌~h揉秘书| 他用嘴巴含着我奶头吸怎么办| 又硬又粗进去好爽a片潘金莲| 色噜噜综合熟女人妻一区| 我强行与岳的性关系| 掀起衣服含着奶头h| 99久久国产热无码精品免费| 折磨女性私密的100种方法| 国语我和子的乱视频| 63歳の熟女セックス| 国模吧无码一区二区三区| 老公的很粗每次进去都很痛 | 丁香六月| 狠狠色丁香婷婷综合久久97| 香港三级伦在线播放| 无码视频一区二区三区| 国产毛多水多女人a片| 国产又色又爽又刺激在线播放| 丰满老女人a片| 粉嫩小泬无遮挡久久久久久| 国产午夜精品一区理论片飘花 | 成人性爱视频在线观看| 爆乳上司julia中文字幕| 国产农妇精品xxx| 欧美一区二区三区视频在线观看 | 野外玩弄大乳孕妇| 免费看曰批女人爽的视频| 99久久99久久精品国产片果冻| 被绑在机器上榨精失禁男男| 受被攻c哭高h视频网站| 精品成在人线av无码免费看 | 窝窝午夜精品一区二区| 艳肉观世音性三级| 女性私密整形视频| 日本人与黑人做爰视频网站|